QUALITY ASSURANCE AS A SERVICE

Verify the PerformanceUsabilitySecurity

of your product quickly and cost-effectively.

Our in-depth understanding of business processes and information technology resources enables us to produce highly customised, market-leading products and services that solve our clients’ complex problems.
Download Brochure

Software Testing/Independent Verification & Validation (IV&V)

IV&V is a process wherein an independent consultant is engaged to ensure a software
conforms to specifications by testing against its requirements and clients’ expectations
and verifying that the system is fit for use.

Verification

Verification is the process of making sure of software accomplishes its objective error-free. The procedure is used to check whether the generated product is acceptable or not.

Validation

Validation is the process of determining whether a software product meets high standards, or in other words product has high level requirements.

Software Testing Scope of Work

We conduct both automated and manual tests to ensure the programme is appropriate
for its intended use and that any defects or bugs are fixed.
Business Processes and Requirements Evaluation
  • The current user requirements are evaluated for correctness, consistency, completeness, accuracy and readability.
  • The project plans are verified to transition from the current business processes to the to-be business processes.
  • Test plans, test cases, and procedures that conform to the project-defined test document purpose, format and content are built.
Integration Testing
  • We ensure the integration test designs, test cases, and procedures are validated and is traceable to requirements and consistent with the test plan.
  • The test environment, tools, and procedures used for integration testing of system modules is thoroughly evaluated.
  • Integration test is performed and the test results are verified to ensure all build functions for the specified sprint/release, and that the tests are appropriately documented, including formal logging of errors found in testing.
System Testing
  • The system’s test designs, test cases, and procedures are comprehensively validated by running sufficient number and types of case scenarios in a realistic, real-time environment. 
  • The test environment, tools, and procedures used for system testing are stringently evaluated. 
  • We ensure all test scripts are tested and verified, with step-by-step procedures, required pre-existing events or triggers, and expected results. 
Acceptance Testing
  • We certify that acceptance procedures and acceptance criteria for each build is defined, reviewed, and approved by clients prior to test, and document the results.
  • The acceptance test plans, test cases, and procedures are verified 
  • We ensure the acceptance test plan addresses the test coverage of acceptance requirements, expected results, and the feasibility of operation and maintenance. 
  • Users are trained to perform the acceptance testing.
QUALITY ASSURANCE SERVICES

The success of your product is guaranteed
by our QA services

We assure improved performance, maximum scalability, expedited test coverage, excellent dependability,
and top-notch quality in our work. We provide the ideal combination of automated and manual testing
services while following the best procedures and standards.
Early Testing (Static Testing)

To assess the traceability of user requirement, the testability of the software and to detect defects before implementation.
Compatibility Testing

To determine whether the software is compatible with other software operating in the same environment .
Conversion Testing

To ensure complete and comprehensive data transfer from the existing software to the new software.
Functional Testing

To determine whether all functions of a build produce the required output per the functional requirements / specifications.
Portability Testing

To ascertain whether the software functions correctly when it is transferred from one environment to another.
Acceptance Testing

To see if a system satisfies its acceptance criteria and help clients decide if they accept the system.
System Testing

To determine end-to-end testing of “integrated” hardware and software components to see if inputs deliver expected outputs.
Integration Testing

To check if defects are exposed in the interaction between build.
Regression Testing

To confirm there are no additional bugs introduced from the modified build.

Test Documents & Reports

Test documents and reports assist the test team in estimating the required test effort, test coverage, resource tracking, progress to completion, summary of all test activities, and final test results.
Test Strategy Document

Addresses multiple test levels.

Test Environment Requirement

Lists requirements of hardware, instrumentation, simulators, software tools, and other support elements needed to conduct a test.

Test Environment Readiness

Reports status of hardware, instrumentation, simulators, software tools, and other support elements needed to conduct a test.

Test Case Specification

Specifies a set of test cases (objective, inputs, test actions, expected results, and execution preconditions) for a test item.

Test Incident Report

Reports on events that occurred during testing which requires investigation.

Test Summary Report

Summarises testing activities and results. It also contains an evaluation of the corresponding test items against exit criteria.

Test Completion Report

Summarises all the tests conducted during the software development life-cycle, it also gives a detailed analysis of the bugs removed and errors found.

Our ultimate goal is to ensure the end product
satisfies its intended use & user needs.

PROCESS FOLW

Our Agile QA Process

The agile QA process begins early in the software development cycle. From the initial design meeting,
the development phase, to final testing and finally the application hardening. This process is
repeated in two-week sprints until the project is released.
  • 01.
    Test Scope Analysis

    The testing scope is a high-level list of product parts that have to be tested in order to gain a reliable assessment of a product’s quality.

  • 02.
    Sprint Test Planning

    We determine the testability of the user stories selected for the sprint and create acceptance tests, define test levels, and identify a suitable test automation tool. Our choice is Leapwork

  • 03.
    Test Execution

    Our scrum team takes the ownership and accountability for the quality of the product, by carrying out functional and non-functional functionalities of the user stories.

  • 04.
    Defect Reporting & Verification

    We identify and report defects based on severity to help the software developers to prioritise their tasks.

Together, let's create a new
quality-focused culture in your business.

Get in touch

Give us a call or fill in the form below and we will contact you. We endeavor to answer all inquiries within 24 hours on business days.







    This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.